News

READ THE LATEST NEWS AND BLOG POSTS FROM ANYTHERM

Don’t miss any news from us by following us on LinkedIn.


  • SEASON’S GREETINGS FROM ANYTHERM

    Category:

    We look back with great gratitude to a very busy but successful year – unfortunately, also a challenging year with geopolitical conflicts or the threat of energy shortages. We are very grateful for the large number of projects which we have been able to carry out. We are constantly expanding our highly engaged Anytherm Team to serve all of our valued customers. It fills us with pride that we have been able to make  sustainable contributions: in the area of…

    read more

    SEASON’S GREETINGS FROM ANYTHERM

  • PROCESSING AND HEAT RECOVERY OF 5 MILLION KILOGRAMS OF PROCESS AIR PER HOUR

    Category:

    Our updated project reference list is available. Don’t hesitate to contact us if you want to learn more about our numerous and versatile projects. Providing solution oriented consulting services and maintenance friendly high quality solutions at internationally competitive prices, our units and services are being used all over the world. Within the last years, we delivered heat exchange and heat recovery units made of over 500 tons of stainless steel material – processing and/or recovering more than 5 million kilograms per hour of production and…

    read more

    PROCESSING AND HEAT RECOVERY OF 5 MILLION KILOGRAMS OF PROCESS AIR PER HOUR

  • CHRISTMAS AND NEW YEAR CAMPAIGN 2021

    Category:

    At Christmas and New Year, people enjoy being together and also like to exchange gifts. Also this year, we wanted to take this beautiful tradition as an opportunity to think of those who have less – who may even be in urgent need of a gift. Instead of sending greeting cards and customer gifts, we therefore once again supported the aid organization Himalayan Life with a donation. With our contribution of CHF 5000, the organization can provide urgently needed help,…

    read more

    CHRISTMAS AND NEW YEAR CAMPAIGN 2021

  • SEASON’S GREETINGS FROM THE ENTIRE ANYTHERM TEAM

    Category:

    With great gratitude we look back to a busy, challenging but successful year. We would like to take this opportunity to thank you for the excellent collaborations and the exciting projects we have carried out together. Merry Christmas and a successful, healthy and happy New Year!

    read more

    SEASON’S GREETINGS FROM THE ENTIRE ANYTHERM TEAM

  • COMMISSIONING OF MAIN STEAM AIR HEATER FOR LARGEST MILK POWDER SPRAY DRYER IN EUROPE

    Category:

    Last month, two of Anytherm’s engineers supervised the commissioning of the main steam air heater supplying process air to the largest milk powder spray dryer in Europe. The steam air heater is designed for an airflow of over 200’000 kg/h, maximum operating air outlet temperature setpoint of 215°C and maximum allowable steam pressure of 27 barg. It consists of 2 units welded back-to-back on site. The complete steam air heater unit includes 1 filter section as well as 5 heater sections (water, flash steam/condensate and 3…

    read more

    COMMISSIONING OF MAIN STEAM AIR HEATER FOR LARGEST MILK POWDER SPRAY DRYER IN EUROPE

  • 500 TONS OF STAINLESS STEEL PROCESSING OVER 4 MILLION KILOGRAMS OF PROCESS AIR PER HOUR

    Category:

    Our updated project reference list is available. Don’t hesitate to contact us if you want to learn more about our numerous and versatile projects. Providing maintenance friendly high quality solutions at internationally competitive prices, our units and services are being used all over the world. Within the last years, we delivered heat exchange and heat recovery units made of nearly 500 tons of stainless steel material – processing and/or recovering more than 4 million kilograms per hour of production and exhaust air. We…

    read more

    500 TONS OF STAINLESS STEEL PROCESSING OVER 4 MILLION KILOGRAMS OF PROCESS AIR PER HOUR

  • FINALIZATION OF FORMER BRUNNER THERMO PROJECTS

    Category:

    A very busy period around the turn of the year lies behind us, in which we were able to complete numerous projects. Despite a generally high workload, Anytherm stood by its customers and bought out all the running projects of its former (bankrupt) competitor Brunner Thermo and finalized them on behalf of its customers. Furthermore, Anytherm employed the majority of the former Brunner Thermo engineering team and can therefore e.g. assist you in providing replacement heat exchanger units formerly supplied from the concursive Brunner…

    read more

    FINALIZATION OF FORMER BRUNNER THERMO PROJECTS

  • MERRY CHRISTMAS AND HAPPY NEW YEAR

    Category:

    A challenging but successful year for Anytherm with many exciting projects is coming to an end. We would like to take this opportunity to thank you for your trust and the successful and pleasant cooperation during the year. We wish you a Merry Christmas, a successful and Happy New Year and are looking forward to a continued good cooperation.

    read more

    MERRY CHRISTMAS AND HAPPY NEW YEAR

  • READY FOR YOUR PENDING PROJECT

    Category:

    Anytherm is at your disposal with full effort in assisting, finalizing and realizing your pending projects placed or intended to place at our former competitor Brunner Thermo GmbH which had to declare bankruptcy. We are pleased to inform that we have employed Maciek Szczech and Tomasz Westrych – the two most experienced engineers of former Brunner Thermo – and can therefore offer you the best possible support in the continuation and execution of your projects. For the entire former Brunner Thermo employees we wish…

    read more

    READY FOR YOUR PENDING PROJECT

  • COVID-19, POSTPONED ORDERS AND PROJECTS ALL AROUND THE WORLD:  REVIEWING THE FIRST HALF OF 2020

    Category:

    Within the last 6 months, Anytherm engineered and processed projects all around the world: from England to South Africa; from France to Vietnam. Looking back at the first half year 2020, Anytherm resumes challenging as well as successful times. Caused by the COVID-19 pandemic, several potential Anytherm projects had been postponed. In order to be on track when returning towards the “business as usual”, Anytherm engineered and processed projects on its own risk before getting the official order. Thanks to…

    read more

    COVID-19, POSTPONED ORDERS AND PROJECTS ALL AROUND THE WORLD:  REVIEWING THE FIRST HALF OF 2020


Don’t Miss Any News From Us by Following Us on LinkedIn